Sector 06
TRANSPORTATION, METEOROLOGY
AND GEOPHYSICS
(US$ mill.)
Project ID Title Foreign Exchange Cost Local Cost Total Cost
980548 Sumatera East Coast Highway Project II 67.50 22.50 90.00
980516 Improvement of Meteorological Monitoring Capability of Haze and Hazardous Weather Condition for Reduction of Natural Disaster and Safety Operation of Civil Aviation and Marine Transport 19.90 2.85 22.75
980451 East-West Connection Road Improvement Project in Central Sulawesi 37.50 12.50 50.00
980450 Road Improvement in Sulawesi, Nusa Tenggara and Maluku 165.00 135.00 300.00
980385 Ujung Pandang Arterial Road Development Project 78.75 26.25 105.00
980371 Urban Road Infrastructure Improvement in Denpasar 35.75 29.25 65.00
980272 Improvement of Weather Radars Network in Indonesia 24.95 3.00 27.95
980269 Procurement of SAR Equipment Phase II 12.00 0.50 12.50
980265 Procurement of 2 Units Inter Island Passenger Vessels and Spare Parts Project 147.00 26.00 173.00
980263 The Supply and Delivery of Airport Rescue and Fire Fighting Equipment Phase I 16.29 2.88 19.17
980260 Maritime Telecommunication System Development (Phase-IV) 36.43 5.44 41.87
980258 Development and Improvement of Marine Aid to Navigation 27.50 0.00 27.50
980252 Belawan, Balikpapan and Banjarmasin Ports Development Project 143.00 69.50 212.50
980249 Navigation Aids & VTIS, Pilot Boat and Tug Boat for Bojonegara Project, West Java 25.00 0.00 25.00
980247 Procurement of 6 (Six) Units Bulk & Breakbulk Vessels for PT. (Persero) Pelayaran Bahtera Adhiguna 3700 DWT Each 38.50 6.80 45.30
980237 Construction of Grade Separation at Manggarai for Jabotabek Railway Project 45.79 12.59 58.38
970516 Construction of 50 Electric Railcar Trainset 124.00 121.00 245.00
970344 Initial Implementation of New CNS/ATM in Indonesia 3.00 1.00 4.00
960237 Bridge Material Supply for Bridge Replacement Program 270.00 0.00 270.00
960199 Cirebon-Kroya Double Tracking (Phase I) 130.27 21.09 151.35
960198 Tanah Abang - Serpong Line Double Tracking Development 70.64 12.47 83.10
960174 Procurement of SAR Communication System 31.00 0.40 31.40
960168 Procurement and Installation of 2 Units Instrument Landing System and 2 Units Runway Visual Range 9.29 1.64 10.93
950520 Improvement of Meteorological Facilities for Marine Meteorological Station 7.50 1.50 9.00
950519 Establishment of Meteorological and Geophysical Operational Centre 10.50 5.00 15.50
950504 New Medan Airport Construction Project 197.07 34.78 231.85
950484 Railway Double Tracking of Kroya-Yogyakarta on the Java South Line, Phase II (Stage I) : Kroya-Kutoarjo 59.50 10.50 70.00
950477 Procurement of 2 units Ro-Ro Ferry Vessels Each 1.000 GRT 12.00 1.20 13.20
941120 Bukittinggi By-Pass Road Development Project 9.75 3.25 13.00
941110 Strategic Urban Road Infrastructure Project 1-B (SURIP 1-B) 72.00 48.00 120.00
940451 Area Traffic Control System (ATCS) Project in Jakarta 62.48 11.03 73.50
940272 Improvement of Aviation Meteorological Facilities at Main Airport 8.00 1.50 9.50
Total 1997.85 629.41 2627.25