HARGA SATUAN TERTINGGI |
||
|
URAIAN KEGIATAN |
SATUAN |
HARGA |
|
I. PEKERJAAN PLESTERAN |
||
|
1. Plesteran tebal 15 mm, 1 : 4 |
M2 |
5.000 |
|
2. Plesteran tebal 15 mm, 1 : 2 |
M2 |
5.500 |
|
3. Plesteran tebal 10 mm, 1 : 4 |
M2 |
4.000 |
|
4. Plesteran tebal 10 mm, 1 : 2 |
M2 |
4.100 |
|
5. Plesteran batu muka 1 : 3 |
M2 |
4.000 |
|
6. Plesteran batu muka 1 : 2 |
M2 |
4.000 |
|
II. PEKERJAAN PASANG BATA |
||
|
1. Pasang bata 1 : 2 |
M2 |
17.500 |
|
2. Pasang bata 1 : 3 |
M2 |
16.250 |
|
3. Pasang bata 1 : 4 |
M2 |
15.750 |
|
III. PEKERJAAN PASANG BATU |
||
|
1. Pasangan Batu Kali 1 : 4 |
M3 |
117.500 |
|
2. Pasangan Batu Kali 1 : 3 |
M3 |
125.000 |
|
3. Pasangan Batu Kosong |
M3 |
48.500 |
|
4. Bronjong kawat berikut batu kali : |
|
|
|
IV. PEKERJAAN BETON ADUKAN |
||
|
1. K 125 |
M3 |
144.000 |
|
2. K 175 |
M3 |
187.600 |
|
3. K 225 |
M3 |
207.000 |
|
3. K 350 |
M3 |
218.000 |
|
V. PEKERJAAN PEMBESIAN |
||
|
1. Konstruksi biasa |
KG |
2.750 |
|
2. Konstruksi berat |
KG |
2.800 |
|
VI. PEKERJAAN BEKISTING |
||
|
A. Dengan multipeks |
||
|
1. Kolom |
M3 |
220.000 |
|
2. Balok |
M3 |
206.600 |
|
3. Lantai |
M3 |
135.000 |
|
4. Duiker |
M3 |
19.500 |
|
B. Dengan papan |
||
|
1. Kolom |
M3 |
196.000 |
|
2. Balok |
M3 |
96.000 |
|
3. Duiker |
M3 |
18.900 |