HARGA SATUAN POKOK KEGIATAN DEPARTEMEN/LEMBAGA : PEKERJAAN UMUM/CIPTA KARYA |
||||
|
NO. |
URAIAN KEGIATAN |
SATUAN |
HARGA |
|
|
I. |
PROGRAM PENYEHATAN LINGKUNGAN PEMUKIMAN |
|||
|
Persampahan |
||||
|
Transfer / Pemindahan |
||||
|
- Transfer Depo |
||||
|
1) Type 50 M2 |
u/bhn/psg |
11.500.000 |
||
|
2) Type 100 M2 |
u/bhn/psg |
12.700.000 |
||
|
3) Type 200 M2 |
u/bhn/psg |
24.500.000 |
||
|
II. |
PROGRAM PENYEDIAAN PERUMAHAN DAN PERMUKIMAN |
|||
|
Pembangunan Perumahan |
||||
|
- Penunjang prasarana dan sarana u/ RSS/RS |
||||
|
a. Jalan setapak |
M |
66.000 |
||
|
b. Saluran air hujan |
M |
61.000 |
||
|
III. |
PROGRAM PENYEDIAAN DAN PENGELOLAAN AIR BERSIH |
|||
|
1. Sistem Pengambilan |
||||
|
a. Penangkap Air |
||||
|
1) 2,5 ltr/dt |
Unit/Bhn/Psg |
21.637.000 |
||
|
2) 5 ltr/dt |
Unit/Bhn/Psg |
24.504.000 |
||
|
3) 10 ltr/dt |
Unit/Bhn/Psg |
30.006.000 |
||
|
b. Sumur Bor dangkal |
||||
|
1) 2,5 ltr/dt |
Unit/Bhn/Psg |
27.115.000 |
||
|
2) 5 ltr/dt |
Unit/Bhn/Psg |
30.294.000 |
||
|
c. Sumur Dalam/Uji/Produksi |
||||
|
1) 2,5 ltr/dt |
Unit/Bhn/Psg |
97.869.000 |
||
|
2) 5 ltr/dt |
Unit/Bhn/Psg |
120.332.800 |
||
|
3) 10 ltr/dt |
Unit/Bhn/Psg |
141.577.700 |
||
|
4) 20 ltr/dt |
Unit/Bhn/Psg |
168.279.600 |
||
|
d. Perlindungan Mata Air (PMA) |
Unit/Bhn/Psg |
2.958.000 |
||
|
Unit/Bhn/Psg |
1.640.500 |
|||
|
e. Penampungan Air Hujan (PAH) kap. 4 M3 |
Unit/Bhn/Psg |
1.816.500 |
||
|
Unit/Bhn/Psg |
1.387.000 |
|||
|
f. Sumur Pompa Tangan (SPT) |
||||
|
1) Dangkal |
Unit/Bhn/Psg |
1.327.700 |
||
|
2) Sedang |
Unit/Bhn/Psg |
2.933.000 |
||
|
3) Dalam |
Unit/Bhn/Psg |
6.839.000 |
||
|
g. Sumur Gali (SGL) |
Unit/Bhn/Psg |
1.049.800 |
||
|
h. Intake |
||||
|
1) 2,5 ltr/dt |
Unit/Bhn/Psg |
13.586.000 |
||
|
2) 5,0 ltr/dt |
Unit/Bhn/Psg |
25.757.500 |
||
|
3) 10 ltr/dt |
Unit/Bhn/Psg |
45.854.000 |
||
|
4) 20 ltr/dt |
Unit/Bhn/Psg |
55.194.500 |
||
|
5) 40 ltr/dt |
Unit/Bhn/Psg |
63.686.000 |
||
|
6) 60 ltr/dt |
Unit/Bhn/Psg |
69.156.000 |
||
|
7) 80 ltr/dt |
Unit/Bhn/Psg |
94.381.000 |
||
|
8) 100 ltr/dt |
Unit/Bhn/Psg |
|||
|
2. Sistim Penampungan |
||||
|
a. Reservoir atas 15 - 20 M. |
||||
|
1) 50 M3 |
Unit Bhn/Psg |
244.854.600 |
||
|
2) 100 M3 |
Unit Bhn/Psg |
348.624.000 |
||
|
3) 200 M3 |
Unit Bhn/Psg |
459.660.000 |
||
|
4) 300 M3 |
Unit Bhn/Psg |
589.875.000 |
||
|
b. Reservoir Bawah 50 M. |
||||
|
1) 50 M3 |
Unit Bhn/Psg |
52.861.000 |
||
|
2) 100 M3 |
Unit Bhn/Psg |
96.076.500 |
||
|
3) 200 M3 |
Unit Bhn/Psg |
153.236.500 |
||
|
4) 300 M3 |
Unit Bhn/Psg |
193.034.500 |
||
|
5) 400 M3 |
Unit Bhn/Psg |
241.504.700 |
||
|
6) 500 M3 |
Unit Bhn/Psg |
285.723.900 |
||
|
7) 750 M3 |
Unit Bhn/Psg |
381.681.000 |
||
|
8) 1000 M3 |
Unit Bhn/Psg |
437.077.500 |
||
|
3. Sistem Pengolahan |
||||
|
a. Saringan Pasir Cepat |
||||
|
1) 20 ltr/dt |
Unit/Bhn/Psg |
74.717.000 |
||
|
2) 40 ltr/dt |
Unit/Bhn/Psg |
146.323.000 |
||
|
3) 60 ltr/dt |
Unit/Bhn/Psg |
166.329.500 |
||
|
4) 80 ltr/dt |
Unit/Bhn/Psg |
231.127.000 |
||
|
5) 100 ltr/dt |
Unit/Bhn/Psg |
300.708.500 |
||
|
6) 120 ltr/dt |
Unit/Bhn/Psg |
375.120.500 |
||
|
b. Saringan Pasir Lambat |
||||
|
1) 5 ltr/dt |
Unit/Bhn/Psg |
300.500.000 |
||
|
2) 10 ltr/dt |
Unit/Bhn/Psg |
565.000.000 |
||
|
4. Sistim Transmisi dan Distribusi : |
||||
|
a. P i p a |
||||
|
1) GIP diameter 8" |
M Psg |
33.000 |
||
|
- |
diameter 6" |
M Psg |
25.500 |
|
|
- |
diameter 4" |
M Psg |
18.900 |
|
|
- |
diameter 3" |
M Psg |
15.500 |
|
|
- |
diameter 2" |
M Psg |
11.000 |
|
|
- |
diameter 1,5" |
M Psg |
9.500 |
|
|
- |
diameter 1" |
M Psg |
7.000 |
|
|
2) ACP diameter 12" |
M Psg |
34.000 |
||
|
- |
diameter 10" |
M Psg |
30.000 |
|
|
- |
diameter 8" |
M Psg |
23.500 |
|
|
- |
diameter 6" |
M Psg |
17.000 |
|
|
3) PVC diameter 12" |
M Bhn |
264.500 |
||
|
- |
diameter 10" |
M Bhn |
183.900 |
|
|
- |
diameter 8" |
M Bhn |
110.000 |
|
|
- |
diameter 6" |
M Bhn |
67.500 |
|
|
- |
diameter 4" |
M Bhn |
32.500 |
|
|
- |
diameter 3" |
M Bhn |
21.000 |
|
|
- |
diameter 2" |
M Bhn |
12.000 |
|
|
- |
diameter 1,5" |
M Bhn |
8.500 |
|
|
- |
diameter 1" |
M Bhn |
6.000 |
|
|
- |
diameter 16" |
M Psg |
71.000 |
|
|
- |
diameter 14" |
M Psg |
61.000 |
|
|
- |
diameter 12" |
M Psg |
53.500 |
|
|
- |
diameter 10" |
M Psg |
40.000 |
|
|
- |
diameter 8" |
M Psg |
25.500 |
|
|
- |
diameter 6" |
M Psg |
20.000 |
|
|
- |
diameter 4" |
M Psg |
16.500 |
|
|
- |
diameter 3" |
M Psg |
12.000 |
|
|
- |
diameter 2" |
M Psg |
9.000 |
|
|
- |
diameter 1,5" |
M Psg |
5.500 |
|
|
- |
diameter 1" |
M Psg |
4.500 |
|
|
4) PVC Untuk Desa diameter 6" |
M Psg |
15.000 |
||
|
- |
diameter 4" |
M Psg |
12.500 |
|
|
- |
diameter 3" |
M Psg |
9.000 |
|
|
- |
diameter 2" |
M Psg |
7.000 |
|
|
- |
diameter 1,5" |
M Psg |
5.000 |
|
|
- |
diameter 1" |
M Psg |
4.500 |
|
|
5) GIP Untuk Desa diameter 6" |
M Psg |
22.000 |
||
|
- |
diameter 4" |
M Psg |
16.500 |
|
|
- |
diameter 3" |
M Psg |
12.500 |
|
|
- |
diameter 2" |
M Psg |
9.500 |
|
|
5. Pelayanan |
||||
|
a. Sambungan Rumah |
||||
|
1) |
Sambungan Rumah |
|||
|
a) diameter 0,5" |
Unit Psg |
220.500 |
||
|
b) diameter 0,75" |
Unit Psg |
254.200 |
||
|
c) diameter 1" |
Unit Psg |
308.900 |
||
|
d) diameter 0,5" |
Unit Psg |
69.000 |
||
|
e) diameter 0,75" |
Unit Psg |
75.800 |
||
|
f) diameter 1" |
Unit Psg |
93.400 |
||
|
2) |
Water Meter. |
|||
|
a) diameter 2" |
Unit Psg |
2.000.000 |
||
|
b) diameter 4" |
Unit Psg |
2.137.000 |
||
|
c) diameter 6" |
Unit Psg |
2.586.900 |
||
|
d) diameter 8" |
Unit Psg |
3.936.600 |
||
|
e) diameter 10" |
Unit Psg |
5.625.450 |
||
|
b. Hidran Umum (HU) |
||||
|
- Kran Umum |
Unit Psg |
389.000 |
||
|
c. Terminal Air |
Unit/Bhn/Psg |
5.660.000 |
||
|
6. Pelengkap |
||||
|
a. Rumah genset/pompa |
||||
|
1) 36 M2 |
Unit/Bhn/Psg |
22.751.600 |
||
|
2) 54 M2 |
Unit/Bhn/Psg |
32.356.000 |
||
|
b. Rumah jaga |
||||
|
1) 36 M2 |
Unit/Bhn/Psg |
19.120.500 |
||
|
2) 54 M2 |
Unit/Bhn/Psg |
23.290.000 |
||